Assembling Hialeah Tote, Daily Racing Form, 1938-12-26

article


view raw text

ASSEMBLING HIALEAH TOTE MIAMI, Fla., Dec. 24.The huge totalizator plant at Hialeah Park is rapidly being put into working shape by engineer" -Bob Stevenson, for the opening of the forty-six day meeting January 11. The task .of assembling the thousands of intricate parte and installing the ticket-selling machines and many other necessary units requires months of advance preparation. The "tote" boards in the paddock, infield and clubhpust -have been placed in "working orcler.


Persistent Link: https://drf.uky.edu/catalog/1930s/drf1938122601/drf1938122601_27_2
Local Identifier: drf1938122601_27_2
Library of Congress Record: https://lccn.loc.gov/unk82075800